The Indian Navy on Friday received Vindhyagiri (Yard 3024), the seventh and final Nilgiri-class stealth frigate under Project 17A, from Garden Reach Shipbuilders and Engineers (GRSE) in Kolkata, marking the completion of the seven-ship programme and a significant milestone in India’s indigenous warship-building capabilities.
The delivery of Vindhyagiri, the third Project 17A frigate built by GRSE, completes the delivery of all seven advanced stealth frigates within just 23 months of the induction of the first-of-class INS Nilgiri on December 20, 2024. The achievement underscores the Indian Navy’s growing design and construction capabilities and its push towards Aatmanirbharta in warship development.
Designed by the Navy’s Warship Design Bureau (WDB) and built under the supervision of the Warship Overseeing Team in Kolkata, the Project 17A frigates represent a significant advancement over the preceding Shivalik-class (Project 17) ships in stealth, survivability, automation, and combat capability.
Named after the Vindhyagiri mountain range in Karnataka, the new frigate is also a reincarnation of the erstwhile INS Vindhyagiri, a Leander-class frigate that served the Indian Navy for 31 years, from July 8, 1981, to June 11, 2012.
The 17A frigates are designed as versatile, multi-mission platforms capable of undertaking a wide range of maritime operations. Their advanced weapons and sensor suites provide enhanced capabilities across the anti-surface, anti-air and anti-submarine warfare domains, making them formidable assets in the Navy’s fleet.
The ships are powered by a Combined Diesel or Gas (CODOG) propulsion system, comprising diesel engines and gas turbines driving controllable-pitch propellers on each shaft. They are also equipped with an Integrated Platform Management System (IPMS), enabling advanced monitoring and control of onboard machinery and platform systems.
The delivery of Vindhyagiri also highlights the gains in construction efficiency achieved during the programme. Drawing on experience acquired from building the preceding six frigates, GRSE completed the final ship in 68 months, substantially reducing the construction period compared with the 84 months taken for the first-of-class INS Nilgiri.
With an indigenous content of 75 per cent, Project 17A has provided a major boost to the domestic defence manufacturing ecosystem. The programme has involved more than 200 micro, small and medium enterprises (MSMEs), generating employment for approximately 4,000 personnel directly and over 10,000 indirectly.
The completion of Project 17A marks an important milestone in the Indian Navy’s efforts to strengthen its indigenous warship design and construction base, while adding a new generation of stealth frigates to its operational fleet.
Team BharatShakti

























